Amerigo Resources (ARREF / TSX:ARG)

Copper & moly tailings toll-processor, El Teniente, Chile · Sep 9, 2026
Finite-life price-deck FCFF · perpetual-growth terminal not applicable
OVERVALUEDRISK: VERY HIGH
Base $1.83 vs price $6.28 · −71%
Price
$6.28
CAD$7.94 on TSX
Base value
$1.83
−71% vs price
Scenario range
$0.91 – $4.65
bull assumes 2047 extension
Key driver
Copper × contract clock
11.3 years of life left
The one number that settles it
Hold copper at today's near-record $6.68/lb for the entire remaining life of the Codelco contract, escalate it 2%/yr, and apply a zero percent discount rate — no time value of money at all. The total cash Amerigo can generate for shareholders between now and contract expiry in 2037 is $5.43 a share. The stock costs $6.28. You cannot get your money back even under assumptions no analyst would defend.

What they actually do

Amerigo does not own a mine or an ounce of ore. Its sole asset is Minera Valle Central (MVC), a plant in Chile that sits downstream of Codelco's El Teniente — the largest underground copper mine on earth — and re-processes the waste. Two feedstocks: fresh tailings piped straight from El Teniente's current milling, and historic tailings dredged out of two old impoundments, Cauquenes and Colihues. MVC scavenges the residual copper and molybdenum, and hands the concentrate back to Codelco. It is a toll-processing arrangement: Codelco keeps title to the metal, and MVC is paid the gross market value of the copper it tolls less a sliding-scale "notional royalty" back to Codelco, less smelting, refining and freight.

Economically it is a spread, not a mine. No exploration, no reserves, no stripping, modest capex ($19M this year), no debt, and a plant that ran at 98% availability. Costs are power, labour and reagents — roughly $2.26–2.40 per pound gross, against ~64 million pounds a year. It is a genuinely good little business, run by a management team that returns essentially all of its cash: $41.7M of dividends and buybacks in the first half of 2026 alone, including a CAD$0.18 performance dividend declared in July.

But it has a maturity date. The DET Agreement runs to 2037 for fresh tailings; Cauquenes ends at the earlier of 2033 or depletion; Colihues at 2037 or depletion. When the contract ends, MVC has no ore of its own, no resource, and a depreciated plant sitting on someone else's land. This is a wasting asset with 11.3 years on the clock — closer in structure to a royalty stream with a hard expiry than to a copper miner. Valuing it with a perpetual-growth terminal value, which is what a standard ginzu run does, would be a category error.

The Take — why I would not own it here

The business is fine. The price is not. ARREF has gone from $1.68 to $6.28 in twelve months, a 274% move, tracking copper to an all-time high of $6.83/lb in August. Every dollar of that re-rating is a bet on the copper price, and the market has now capitalised a cyclical peak into a contract that expires.

Amerigo keeps far less of the copper upside than the tape implies. Between Q2-2025 and Q2-2026 the realised copper price rose $1.74/lb. Over the same span the notional royalty paid back to Codelco rose from $1.36/lb to $2.45/lb. Codelco captured 63% of the increment. The sliding scale was written to top out at 28.4% around $4.80/lb copper; the effective take is now ~36% of gross value, and the MD&A confirms the parties are renegotiating the terms because prices have been above the top of the scale since October 2025. Codelco — which just posted its lowest output in three decades, had a fatal collapse at El Teniente, and had to be handed $2.4B of retained profits by the Chilean state — is not walking into that negotiation looking to give Amerigo more. This is the rare situation where the stock's biggest tailwind is also its largest live downside catalyst.

The reverse-DCF is not close. To justify $6.28 with the contract running to 2037 at my base production and cost profile, you need copper to sit at $10.53/lb — 58% above spot — every year until expiry. Cut the discount rate to a charitable 9.0% and you still need $9.54/lb. Hold spot forever and stretch the contract to 2067 and you get $4.18. There is no coherent set of assumptions that reaches today's price.

And the current earnings are not normal earnings. Trailing EBIT is $96.7M; the five-year average is $38.7M. The market is paying 10x trailing EBIT and 25x normalised EBIT for eleven years of cash flow. Note the shape of the sensitivity grid below: value barely moves with the discount rate, because the cash flows are short-dated. You cannot discount-rate your way to $6.28. Only copper at $9–10/lb does it.

One more thing that is being missed. El Teniente's own output fell ~27% year-on-year through May 2026, and the Andes Norte expansion has been suspended for up to two years after seismic problems. Amerigo's throughput is nonetheless running at guidance. That is only possible because MVC is leaning harder on the historic impoundments — the finite ones that must last until 2033. Strong near-term volumes in a year of weak fresh-tailings supply are not a sign of strength; they are the asset being consumed faster.

Verdict: avoid as an investment; if you must be here, be here as a copper momentum trade with a stop, not as a holding. Fair value is $1.83 in the base case and $4.65 even if you grant a ten-year contract extension and $7 copper. A 5.75% dividend yield does not fix a 71% valuation gap — that yield is the asset paying itself out, not compounding.

Risk profile — VERY HIGH

What the "inventory" really is: a levered claim on the copper price, net of a sliding royalty that rises with that same price, expiring in 2037. Long copper, long molybdenum, short Chilean power and labour, short Codelco's operating reliability and negotiating posture.

Sensitivity grid — value per share vs long-run copper × WACC

Long-run Cu
from 2030
WACC
9.5%
WACC
11.0%
WACC
12.5%
WACC
14.0%
WACC
15.5%
$4.00$1.15$1.11$1.08$1.04$1.01
$4.50$1.53$1.47$1.41$1.36$1.31
$5.00 ★$1.91$1.82$1.74$1.67$1.60
$5.50$2.29$2.18$2.08$1.98$1.90
$6.00$2.67$2.53$2.41$2.29$2.19
$6.68$3.19$3.02$2.86$2.72$2.59
$7.50$3.81$3.60$3.41$3.23$3.07
Read the columns, not the rows. Moving the discount rate across a full 600bp range shifts value by ~$0.31. Moving long-run copper from $4.00 to $7.50 shifts it by $2.33. The discount rate is nearly irrelevant here because the asset dies in 2037 — this is a commodity bet with a fuse, not a duration asset. Nothing in the grid reaches $6.28. ★ = base case.

Driver tornado — what this investment actually is

Copper price deck ±20%
$1.02–$2.64
Contract life 2042 / 2032
$1.54–$2.40
Cash cost -10% / +10%
$1.43–$2.23
Moly price ±30%
$1.62–$2.04
WACC 9.5% / 15.5%
$1.69–$2.00
DET royalty pass-through 0.35 / 0.65
$1.68–$1.98
Throughput +10% / -10%
$1.70–$1.96
Tax rate 30% / 40%
$1.72–$1.94
The widest bar is the copper deck; the second widest is how long the contract runs. Note that throughput barely matters (±10% of volume is worth $0.26) because volume scales revenue and cash cost together — Amerigo is a margin-per-pound business. Buying ARREF is buying copper and a calendar.

Operating income — and what "normal" is ($M)

6620212520227202336202459202597TTM5y avg 38.7
Trailing EBIT of $96.7M is a cycle-peak print, 2.5x the five-year average of $38.7M. The market is paying 10x the peak and 25x the average.

Scenarios — value per share

Bear — Cu $4.25, Cauquenes depletes 2031
$0.91
Base — Cu glides to $5.00, contract ends 2037
$1.83
Bull — Cu $7.00+, contract extended to 2047
$4.65
Market price today
$6.28
Even the bull case — $7.00 copper escalating, 65 Mlb/yr, and a full ten-year extension of the Codelco agreement to 2047 at an 11.5% discount rate — lands 26% below the current price.

Base-case cash flow build ($M, USD)

YearCu Mlb Cu $/lbRevenue EBITFCFF PV @12.5%
202619.8$6.4092372525
202762.0$6.00270936862
202862.0$5.50250695343
202962.0$5.20241574532
203062.0$5.00235473825
203162.0$5.10239463822
203262.0$5.20243463819
203356.0$5.31225483917
203448.0$5.41195363213
203548.0$5.52198363111
203648.0$5.63201353110
203748.0$5.7420435319
2026 is a stub (4 months). PV of operating cash flows $280M, less $30M of discounted closure cost, plus $48M net cash, less $32M of in-the-money options = $296M equity, $1.83/share on 161.4M shares. Terminal value after 2037: zero.

Inputs & cost of capital

Risk-free (US 10y, 9/9/26)4.83%
Mature-market ERP4.50%
Chile country risk premium1.30%
Bottom-up beta (single-asset Cu processor)1.40
Cost of equity = WACC (zero debt)12.9% → use 12.5%
Effective tax rate (Chile + repatriation)35%
Net Cu revenue @ $6.16/lb realised$3.92 /lb
Marginal pass-through of copper price50%
Gross cash cost 2026 (incl. by-product credit)$2.40 /lb
Cost escalation2.5%/yr
Contract horizon2037 (fresh) / 2033 (Cauquenes)

Market & balance sheet cross-checks

Market cap$1,014M
Cash / total debt (6/30/26)$50.3M / $0
Enterprise value$966M
EV / TTM EBIT ($96.7M)10.0x
EV / normalised EBIT ($38.7M)25.0x
P/E trailing17.6x
FCF yield (TTM $71.3M)7.0%
Dividend yield (incl. performance div)5.8%
EV per pound of annual production$15.14
EV per remaining lb to 2037 (~680 Mlb)$1.42
12-month price move$1.68 → $6.28 (+274%)

On the "good swing candidate" question

The chart is genuinely strong: higher lows every month since October 2025, a clean break through $6.00 in early August, and a fresh 52-week high ($6.38) on Sep 4. As a momentum trade that is a legitimate setup. As a swing it carries three specific hazards that a normal equity does not:

If traded: half a normal position or less, a hard stop under the $5.35 August breakout shelf, and a rule that it is closed on any break of copper below $6.20. Do not let a trade become a hold on the strength of the dividend — a 5.8% yield paid out of a wasting asset is a return of capital dressed as a return on it.

Method: finite-life price-deck FCFF. The standard perpetual-growth ginzu terminal block is deliberately suppressed — MVC holds a processing contract, not a resource, so terminal value beyond 2037 is zero absent a renewal that has not been granted. Unit economics calibrated to the Q2-2026 MD&A (revenue bridge, DET notional royalty, cash-cost components) and back-tested against FY2024 (predicted EBIT $36.1M vs actual $36.1M) and FY2025 ($56.2M vs $59.2M). It over-predicts FY2023, when drought-related water restrictions cut throughput and lifted unit costs — a reminder that the operating assumptions here are calibrated to a well-behaved plant. Sources: Amerigo Q2-2026 MD&A and operational release, stockanalysis.com financial statements, Trading Economics (copper, US 10y), Fastmarkets and Mining.com (Codelco / El Teniente), Robinhood market data. Prepared Sep 9, 2026 — analysis, not investment advice.